For more than 75 years, the advantages of weather proofing provided by
cavity walls has been recognised. As the inner and outer leaves of cavity
walls are physically separated, some sort of tying device is needed to
give the walls stability and consolidation. This is provided by wall ties,
which in early cavity walls could have been anything linking the walls
together – including through-stones. Through-stones are also found in
rubble filled solid stone walls and have the same function of holding the
outer and inner leaves together. More recently wall ties have been metal,
usually mild steel in bar or wire form, but these are susceptible to
corrosion. Protection of the ties against corrosion has been by coating
them with bitumen, zinc (galvanisation) and plastic, but none of these has
provided a long term solution to corrosion.
In 1981 new standards for ties were developed by the Building Research
Establishment (BRE) www.bre.co.uk and
BRE 329 and 401 guideline publications were created for remedial wall tie
inspections and works.
Wall tie replacement is now almost exclusively based on the use of
stainless steel ties and all new buildings usually have these.
In older cavity constructed buildings with wall ties, corrosion of
steel ties is inevitable in all properties, with the durability of ties
depending on the type of the tie, its coating, and the chemical processes
that might encourage corrosion. For example, corrosion is more likely to
occur in walls which are more exposed to the weather (water), where
mortars are of black ash type (acid), or in seaside properties where sea
spray (salts) might occur.
The condition and type of the existing ties can be established by
removing sample ties, removing bricks to expose the ties, chiselling out
mortar to expose a tie end, or more usually and with least damage, by the
location of sample ties with a metal detector and viewing them in the
cavity using an endoscope. Any brown rust corrosion of any tie seen is an
indication of the need for wall tie replacement as ongoing corrosion is
inevitable. The immediacy of replacement depends on the level of
corrosion, but most remedial works become part of the sale/purchase of any
property and are therefore immediate, and often a mortgage requirement.
Building Research Establishment Digest 401 (January 1995), table 4,
gives advice on suitable action to take in relation to the findings of a
survey, where existing wall ties are found to have red rust on them.
Reference 6 in this table sets out the following:-
a). The classification is suitable for metal
ties originally protected by both bitumen paint and galvanised zinc
coatings.
b). The predicted life of such ties is listed
as "N/A" - not applicable - i.e. there is no predicted life of
the ties in this condition.
c). The recommended action is divided into two
areas of advice:-
(i) Best recommended action - "Fit remedial
ties"
(ii) Minimum recommended action - "Schedule
repairs"
This is a clear guidance for us of what to recommend where ties have been
found to be rusting. In addition where ties have red rusting and
erosion (loss of the metal in the thickness of the ties), the only
recommended action is "Fit remedial ties". The standards to work
to are therefore set out clearly in BRE Digest 401, and there can be
little room for misinterpretation.
Remedial treatment of ties involves two processes:-
The new tie system we use depends on the masonry to be tied, but in
most cases we have found mechanical ties with expanding neoprene sleeves
suitable. We have available resin fixed ties should the former be
unsuitable. Our remedial tie supplier, PAM Ties http://www.pamties.co.uk/walltiehistory.htm
has further useful information on their website.
The existing ties must be dealt with as their continuing corrosion can
result in structural damage to buildings. Such corrosion can result in the
expansion of the metal embedded in the outer leaf of the wall. This
expansion may eventually result in the tie becoming up to four times its
original thickness, sometimes splitting the mortar bed joints, causing
either lift and/or bowing of the walls and damage to internal plastered
finishes. Instability of the wall can result if the wall ties waste away
and break completely, resulting in a need to rebuild the wall. Little or
no damage to walls may occur where the tie is of the ‘butterfly’ (referring to shape) wire type, but this depends
on the thickness of the mortar bed between the bricks and the thickness of
the metal wire of the tie.
The density of wall ties in a wall should be 2.5 ties per m2,
with there being an increase in ties around openings such as windows and
doors. These are the points where the wall structure is compromised by the
openings. Here the tie spacing should be a minimum of 300 mm. These tie
densities are usually not found in properties built before say, 1981.
Although the tie density of 2.5 is usually there, there is usually a lack
of ties around the openings. This can be remedied by installing extra
ties.
A lack of wall ties in a cavity wall considerably reduces the strength
and stability of the wall, in particular resistance to wind loads. While
sudden failure is unlikely to occur it would be prudent to rectify the
matter once noted as the defect is liable to affect the value and resale
prospects of any property.
If symptoms are recognised before damage has progressed too far, the
walls may be treated rather than rebuilt. This consists of locating the
old wall ties with an electronic metal detector, installing a suitable
corrosion-resistant remedial fixing and isolating the original wall ties
to prevent further damage to the outer leaf. Where wire ties have been
used and they are corroded, new ties will need to be installed, usually
without the need to isolate or remove the old wire ties.
Existing Wall Ties
Any existing ferrous metal wall ties left in place may continue to
corrode and cause disruption of the brickwork. There are techniques
available to overcome this potential problem; removal of the old ties
completely, or isolation of the tie end in the outer brick leaf. Complete
removal of the wall ties would ensure that corrosion and expansion of the
ties could not affect the inner or outer brick leaves in the future. There
are, however, disadvantages associated with tie removal.
-
The
extra cost involved in having to remove and replace bricks to allow
removal of the ties.
-
Damage to existing coatings
or renders (if present) and consequent cosmetic impact on the outside
of the house.
-
There
is a possibility that while extracting the old wall ties some damage
might occur to the internal wall plaster, particularly if it is old or
in poor condition.
The isolation method involves raking or grinding out the mortar bed
joints around all accessible existing wall ties, back filling with a
compressible material (foam or fibre insulation) and repointing of this
area with sand/cement mortar. This method has a considerable cost saving
over complete tie removal, resulting in less disruption to the masonry and
no possible damage to the internal plasterwork. The principle of isolation
relies on the fact that in almost all cases the wall ties are more
corroded in the outer than the inner leaf, due to the outer leaf of
brickwork being more exposed to the weather. No one can say with certainty
that disruption of the inner leaf will never occur, as corrosion is an
ongoing and accelerating process. This should be borne in mind when
deciding which system to adopt.
When carrying out wall tie work, we usually carry out the following:-
-
Erection
and dismantling of any scaffolding/towers necessary to complete the
work safely.
-
Location
of the existing cavity wall ties using a metal detector. (#)
-
Installation
of stainless steel wall ties to cavity wall sections (not solid
wall areas), positioned in accordance with the wall tie
manufacturer’s instructions, which is in accordance with current
Building Research Establishment (BRE) recommendations.
-
Random
checking of several of the new ties, in order to ensure that correct
fixing has been achieved.
-
Assessment
of original wall ties from the most exposed areas of brickwork to be
treated, so that the condition of metal in contact with the inner skin
of brickwork can be considered. (#)
-
Isolation
of original wall ties over the treated areas, to ensure no damage
occurs to outer leaf masonry as a result of further corrosion. The
method of isolating original wall ties depends on the condition of the
samples assessed in 5 above. Wire “butterfly” type ties do not
normally need to be isolated. (#)
-
Making
good (excluding redecoration) of any brickwork, render or mortar
disturbed during the wall tie installation or isolation process.
-
Removal
of dust and debris created by the work leaving the adjacent site or
garden in a clean and tidy condition. We are unable to avoid some
contamination and damage by dust and debris to outside surfaces,
including vegetation.
-
The
issue of our 20 year guarantee (insurance backed if required) after
payment of our account in full.
(#) Items marked 2,5 and 6 are excluded from the works where installation
only is carried out.
Special notes for the installation and isolation of cavity wall ties
The drilling of brickwork, mortar beds, render and other masonry
materials causes a lot of dust. Given unfavourable wind conditions this
can be carried away from the area of our work to contaminate other areas
such as plants, windows, driveways, parked vehicles and paths. Where
windows, doors and other openings (e.g. ventilation points, cat flaps
etc.) are left open dust can get inside the property. Neighbour’s and
your own washing hung outside may also be at risk. All precautions should
be taken to minimise the opportunities for such problems to arise and
early discussion with neighbours is advised. Where party or shared walls
are to be treated it is a legal requirement that you notify and obtain the
consent of the adjoining owner under the Party Wall etc. Act 1996.
Drilling will also cause vibration which can affect hanging items and
ornaments inside houses, and sensitive intruder alarm systems both inside
and outside houses. These should be removed or in the case of alarms,
deactivated, before work is started. Some alarm systems go into
“tamper” mode as a result of vibration. Occasionally drilling
vibration may also cause minor damage to internal block or brickwork and
also plasterwork, particularly if they are in old or poor condition.
It will not be possible to install new ties or isolate existing
original ties in areas that are inaccessible. This includes areas covered
by or close to guttering, down piping, satellite dishes, external lights,
alarm boxes, gas systems or electricity wire runs and other wall fixed
items. This will rarely affect the isolation of more than several original
ties in any one property and therefore should not be regarded as a
significant problem.
Wall tie work is undertaken from the outside of the property. The work
is weather dependent as we can not use electrical equipment (e.g. drills
and grinders) outside in wet weather. This may mean delays and the need to
reschedule the completion of the work.
We require access to a 13 amp, 240 volt electric power and a clean
water supply. Our requirement for power can be high for short periods so
access to the main electric meter switch board/fuses must be allowed. If
electricity is not available then we would hire a generator at the
client's cost.
Before attending site, we require that all movable items next to the
external walls of the property are moved by the client so that we can gain
access to the walls with either our tower scaffolding or ladders. This
includes vegetation growing up or bearing onto the walls. The use of this
equipment sometimes results in localised damage to flower beds and their
contents, though we will do our best to minimise this damage.
Health and Safety - Scaffolding
The Health and Safety Executive are charged with the responsibility of
enforcing the Heath and Safety at Work Act. One of their key points of
interest is falls from height. Falls from height are responsible for the
highest proportion of the deaths in UK construction. For this reason wall
tie installers are under scrutiny with regard to wall access off ladders
and tower- or fixed-scaffolding. In general it is perceived that working
off ladders for prolonged periods should be avoided, with ladder access
being substituted for access off tower- or fixed-scaffolding. New Health
and Safety law for this was introduced in 2005 and last amended in 2007 - Working
at Height Regulations 2005. A brief summary of the 2005 regulations is
available. 2005
Regulations.
Access off ladders is a quick and convenient method for getting at
sections of wall for wall tie installation. However, the risks of using
ladders is well known. Companies are required to carry out risk
assessments with regards to all aspects of their business and this
includes the use of ladders. In essence, if a safer method of gaining
access to a wall is to use scaffolding, then this is what should be used
in all cases. However, it is also true to say that ultimately a
fixed-scaffolding is safer than a tower-scaffold, and so the same
principal should apply. So ideally any wall tie work would be carried out
to a property that had been fully fixed-scaffolded to all of the walls.
This would have a very significant impact on the cost of doing the job.
But what price for health and safety ?
In practice, the decision to use any of the access methods must be the
result of an individual property assessment by the surveyor, and an
assessment made by the operators at the time of doing the work. This must
be backed up by a culture of health and safety consciousness that runs
throughout the company right from the very top.
As a result of this our operators are equipped with ladders and with
tower-scaffolding and the know-how to use them safely. In addition our
surveyors assess difficult-to-access walls and may call for the use of a
fixed-scaffold. An example of this might be where the height of a wall is
greater than 6 metres or the ground below the wall is uneven or at several
levels. An estimated scaffold cost is shown on our quotes and we use
a professional scaffolding company, with the right insurance in place, to
erect and dismantle it.
Our experience in the market is that there are installers of wall ties
that take little attention of the installation guidelines (the how it
should be done), and even less attention to health and safety. They are
likely to be uninsured as well. They are also the ones offering to do the
job for low rates and usually for quick cash. Any guarantee
they issue is probably worthless.
What happens if they have an accident while doing the wall ties on your
property ? If they are hurt and can not work for a prolonged period they
may try to make a claim on you. Technically you are their employer for the
job, so their health and safety might become your responsibility. To avoid
this problem use a reputable installer and check for details of how the
job will be done and what insurance is in place.
If you are in any doubt as to the extent of our work or the
consequences of it, please do not hesitate to discuss this with us.
We have found that planning ahead always helps the smooth running of the
work and contributes to the client’s satisfaction of the work done.
|